UniLime has been operated in October city in 2020 to the increasing need of high quality burnt lime required
for several industries, the group agreed with the Switzerland Maerz group to have a Lime calcination plant
(Uni-Lime co.) with total investment of ~ $ 10 million.
The Lime Calcination project consists of a double shaft kiln with ten (10) burner lances each.
Item | Trade Name | Chemical Compound Name | Size | Quantity | |
---|---|---|---|---|---|
From | TO | ||||
Product | Quike Lime | CaO | 20 mm | 50 mm | Up 90% |
3 mm | 20 mm | Up 90% | |||
0 mm | 3 mm | Up 90% |